Unlike seeded grass, which can take months to grow, sod can be installed in just a few days. This is ideal if you want to enjoy a lush green lawn quickly.

Iată cum se montează un gazon rulou în curte:

Clean the area: Remove weeds, rocks, plant debris, and other objects that could prevent grass growth.

Level the ground: Make sure the ground is level to avoid water puddles after rain.

Till the soil: Till the soil to a depth of about 10 cm to improve drainage and aeration.

Add fertilizer: Add a layer of organic or chemical fertilizer rich in nitrogen, phosphorus, and potassium to nourish the soil.

Roll the ground: Roll the ground with a roller to compact the soil and create a smooth surface.

Sod installation:

Choose the right time: The best time to install sod is spring or fall when temperatures are moderate and humidity is high.

Unload the sod rolls: Unload the sod rolls as soon as possible after purchase and store them in a shady, cool place.

Start installation from a corner of the yard: Unroll the first piece of sod and lay it on the ground, making sure it is well secured.

Continue installation: Lay the sod pieces next to each other, ensuring there are no gaps between them. Cut the sod pieces as needed to fit the shape of the yard.

Press down the sod: Press down on the sod pieces with your foot or a light roller to secure them to the soil.